Operations Entrusted Operation Mode Ensu

Posted on July 3rd, 2010

Posted by admin

Operations entrusted operation mode, ensure the bound of the effective operation of wastewater treatment facilities, achieve emissions targetsAccording to the operation of wastewater treatment project of hainan entrusted to the requirements of the tender documents, founded in haikou city ZhongBiaoZhe registered capital of 5 million yuan RMB, the project company to gain the right management of wastewater treatment plant. But
In earlier, BeiKong, Thornton had stationed relevant personnel in advance. BeiKong treatment allocation in every 2 ~ 3 people. While Thornton in every project package for wastewater treatment were established a 10 people, the total area of a project management department lead.For the ZhongBiaoZhe "in hainan in bidding for project completion and commissioning namely intervention" regulation, water ChengShiChu hall of
Hainan ShenZhongTao said. According to the understanding of the sewage treatment plant, deployment into will mainly about project progress, and the local government, total contractor for related matters of communication. Will also be in post project handover, equipment quality, engineering quality defects may play professional company to make special. In addition also will participate in single debugging, water linkage, etc.

Comments ( 0 )

Posted under: environment

The Eleventh Fiveyear Plan Of

Posted on July 3rd, 2010

Posted by admin

The eleventh five-year plan of construction projects, and management of river basin water environment pollution is one of the key projects. China’s environmental ChenXiangJing news reporterBy hainan water hall, shenzhen cardiokine public bidding scheme design consultancy, 16 is put into production of small-sized sewage treatment plants are packaged bidding operators. Successful bid Thornton proceedings and BeiKong group and water has
Begun nervous prophase work.The government investment, bidding for factory, hainan entrusted operators and not first. However, tsinghua university suggested solutions, professional consulting company whole operation, water enterprise first echelon collective appearance, private enterprises both rational low quoted price… Around the hainan 16 sewage treatment plant operation of tender topic, packing industry caused widespread. As the water industry of tsinghua university,
Director of the policy research center FuTao, water operators in consultation, technology, etc, and each link is comparatively mature form with the core of service development trend.Recently the urban water strategy by 2010, shenzhen cardiokine BBS WangHai general public consultation company introduced hainan sewage treatment facilities of water, entrust operation modes.Why should the government tender operation?As the key problem, take

Comments ( 3 )

Posted under: environment

Still Use AAO Process

Posted on July 3rd, 2010

Posted by admin

Still use AA/O process, sewage treatment, the secondary and tertiary biological sludge treatment and the depth of the water, the state will reach urban sewage treatment plants standards for pollutants discharge GB18918-2002, the level of A standard, the processed sewage to xitang port. Engineering services for 11.42 square kilometers.Traders couch sewage relocation project with A total investment of RMB for
3345 scale for 2,500 m3 / day, MSBR process, by using water MSBR + fiber cloth filter, supplemented by chemical phosphorus measures, the state will achieve water quality standards for pollutants discharge sewage town of GB18918-2002, the level of A standard after treatment of sewage discharge to vast port. Service scope 30 square kilometers. Report from our correspondent nanjing build
Water Co., LTD has AnDaShi in heilongjiang province held a sewage treatment works at the opening ceremony.Anda wastewater treatment projects including drainage network system engineering, sewage treatment system, water treatment system and reclaimed water conveyance pipeline engineering and ability to 4.5 million cubic meters, the executive level B standard, into the rich foam, eventually to river. The project is in

Comments ( 0 )

Posted under: environment

More Than Half A Year

Posted on July 2nd, 2010

Posted by admin

More than half a year to run, currently has the datang international power generation Co., LTD. Accumulated more than 50 tons of water transport. According to the environmental protection department is introduced, datang international power company limited, the enterprise after full operation can be "drink" fall in the water, water all urban sewage to the Yellow River "zero emission. QingTongXiaShi
Sewage treatment center director YeRongHai introduces to the reporter, datang international power Co., LTD. Through water-recovery engineering, and can save water cost 554 workers exposure to yuan. Report from our correspondent Shanghai liantang sewage treatment plant, the second phase of expansion project couch sewage treatment plant in recent relocation project, the construction. Late next plan built and put into operation,
The two big project is national in taihu lake basin water environment comprehensive governance and Shanghai first round three environmental action plan project.Shanghai liantang sewage treatment plant the second-phase extension project with A total investment of nearly 24 million yuan, covers an area of about 26.3 mu, the scale expansion to 6,000 cubic meters per day, with the same phase

Comments ( 0 )

Posted under: environment

Posted on July 2nd, 2010

Posted by admin

China’s environmental news reporter li QiaoHuaPing yinchuan reported more tiger correspondent in ningxia hui autonomous region QingTongXiaShi successfully urban sewage treatment plants and plants, water reuse effective alliances more than 3,000 tons every day, urban water flowing to datang international power Co., ltd., as each year, generating cooling water only, enterprise can save water costs 554 workers exposure to yuan.QingTongXiaShi
Is a new riverside city, has no construction in the urban sewage treatment, and each city sewage without any processing straight into the Yellow River. To reduce the pollution of water resources utilization, 2006, QingTongXiaShi investment 6700 yuan, the construction of sewage treatment capacity in 4.4 million tons. In 2007, the day QingTongXiaShi start construction project of 2.5 million tons,
Water-recovery will be treated as thermal power plant water directly to the cooling water. The government and the QingTongXiaShi datang international power Co., LTD. Signed an agreement, the city water use in waterworks will provide water to plant 438 million tons.To further implement the agreement, QingTongXiaShi in sewage and laid a for power between the water pipe 18.2 kilometers. After

Comments ( 6 )